The cappuccino effect is the oldest trick in bunkering: air is blown into the fuel as it is delivered, the foam swells the volume in the barge's tanks and the vessel's, and the soundings show the quantity the bunker delivery note promised. Hours later the air escapes, the level drops and the ship has paid for fuel it never received. A careful bunker survey is how owners catch it — on the spot, while the barge is still alongside.
What the cappuccino effect is
Fuel bought by quantity is measured by volume. A barge that blows compressed air through its lines during delivery — or strips its tanks for too long with a pump that draws air — sends a froth of fuel and air to the ship. The froth reads like fuel on every gauge. Both sides' soundings agree with the bunker delivery note (BDN), the chief engineer signs, and the barge casts off.
Over the following hours the air separates. The level in the ship's tanks falls, sometimes by several per cent, and the missing tonnes are discovered when the barge is long gone. Without evidence collected during the delivery, a claim is hard to make.
The signs during delivery
P&I clubs have published the same warning signs for years. Watch for them from the opening gauge to the last stripping:
- Froth or foam on the fuel surface when the barge's tanks are opened for gauging
- Excessive bubbles on the sounding tape, before, during and after the delivery
- The delivery hose jerking or whipping, or pulsing irregularly
- Gurgling or rumbling noises near the manifold
- A delivery rate slower than agreed, or long periods of stripping at the end
- Prolonged blowing of the lines with air after pumping stops
- Temperatures on the BDN that do not match the temperatures measured on board
None of these proves a shortage on its own. Together, recorded with times and photographs, they make the soundings credible.
The bunker survey that proves it
Before pumping: sound the barge and the ship
Gauge every barge tank that will deliver, with temperatures, and sound every ship's tank that will receive, including the ones that are not supposed to receive. Check the barge's tank calibration tables and the seals.
Agree the sampling
Draw the samples at the ship's manifold, continuously through the delivery, and seal them jointly. Look at a sample in a clean glass jar: aerated fuel is visibly foamy.
During pumping: watch and record
Monitor the delivery rate and the line pressure; note every sign of aeration with its time. Sound the receiving tanks during the delivery, not only at the end.
After pumping: sound again, then wait
Gauge the barge and sound the ship's tanks with temperatures. Then let the fuel settle and sound the ship's tanks again: a drop in level after settling is the signature of entrained air.
Reconcile and decide
Correct every volume to 15 °C, convert to metric tons in air, and compare the quantity received with the BDN.
A worked reconciliation
A Supramax takes VLSFO into two tanks. The BDN states 615.000 metric tons, density 975.2 kg/m³ at 15 °C. The chief engineer sounds both tanks before and after the delivery. Each volume is corrected to 15 °C with the ASTM Table 54B factor for its own temperature — the formula is in the cell, point at it — and converted to tons with the Table 56 factor, 0.9741 for this density:
| Tank | Stage | Volume (m³) | Temp (°C) | VCF 54B | GSV (m³) | MT in air |
|---|---|---|---|---|---|---|
| 3P | Before | 85.420 | 38.0 | 0.9839 | 84.045 | 81.868 |
| 3P | After | 402.110 | 44.5 | 0.9794 | 393.827 | 383.627 |
| 3S | Before | 79.880 | 37.5 | 0.9843 | 78.626 | 76.590 |
| 3S | After | 395.560 | 44.0 | 0.9797 | 387.530 | 377.493 |
| Received | 618.686 | 602.662 |
The vessel received 602.662 metric tons. Set against the BDN:
| Item | Value | Unit |
|---|---|---|
| BDN quantity | 615 | MT |
| Received by the vessel | 602.662 | MT |
| Difference | -12.338 | MT |
| Difference | -2.006 | % |
| Commercial tolerance | 0.5 | % |
| Verdict | Beyond tolerance |
A shortage of 12.338 tons, 2.006 % of the BDN — four times the usual commercial tolerance. The BDN's own arithmetic holds (646.281 m³ at 48 °C, factor 0.9769, gives 631.352 m³ at 15 °C and 615.000 tons), so the difference lies in what was measured, not in how it was calculated. With signs of aeration recorded during the delivery, this is a case for protest.
The corrections themselves — why 15 °C, where 0.0006952 comes from and how Table 56 turns cubic metres into tons — are set out in ASTM Table 54B: volume correction for fuel oil.
Settling: the second sounding
The most persuasive evidence of the cappuccino effect is a second sounding after the fuel has settled. Air escapes within hours; fuel does not evaporate in that time. If the corrected quantity in the receiving tanks falls between the first and the second sounding, and nothing has been consumed or transferred, the difference was air.
There is no fixed waiting time. Air leaves hot, thin fuel faster than cold, viscous fuel, and a tank with heating coils running settles differently from one without. Many surveyors sound the receiving tanks a few hours after the delivery and again the next morning, always at the same reference heights and with fresh temperatures, and correct each sounding to 15 °C before comparing them.
The letter of protest
When the quantity received falls short beyond tolerance, or the delivery showed signs of aeration, the master or chief engineer issues a letter of protest to the barge before it leaves, and endorses the BDN accordingly. The barge master signs the letter for receipt; that signature does not admit the claim, but it proves the protest was made at the time.
LETTER OF PROTEST
To: Master of barge __________ / Bunker supplier __________
Vessel: M/V __________ Port: __________ Date: __ / __ / ____
Bunker delivery note no. ______ states ______ MT of ______,
density ______ kg/m3 at 15 °C.
Ship's tanks sounded before and after delivery, corrected per
ASTM Tables 54B and 56, show ______ MT received:
a shortage of ______ MT (______ %).
Observed during delivery: ______________________________
We hereby hold you and your principals responsible for the
shortage and for all consequences, reserving all rights.
Master / Chief Engineer __________ Received by __________
The BQS & LOP generator runs the whole reconciliation from the BDN and the soundings, scores the signs of aeration and writes the letter of protest from the figures, in a PDF ready for signature.
Questions about the cappuccino effect
Can the cappuccino effect be seen in the samples?
Often, yes: a sample drawn into a clean glass jar during the delivery shows foam or bubbles. The jointly sealed samples are also tested later for density, which affects the tons calculated.
Which density should the reconciliation use?
The BDN density, as a rule, so both sides use the same figure. When the ship's own sample has been tested and differs, run the calculation with it as well to see what it changes.
Should an independent surveyor attend?
For large deliveries, or when a supplier has a history of disputes, an independent bunker surveyor on board protects both the evidence and the claim. P&I clubs recommend it when a large shortage appears.
The desk's marine survey surveyors attend bunker deliveries in Brazilian ports, from the opening gauge to the second sounding.
资料来源
付诸实践
邮件订阅报告
每篇新报告,直达您的收件箱。
来自调度中心的方法、数据与证据:每发布一篇报告,以您的语言发送一封邮件,别无其他。