Draft Survey Calculation: The Displacement Method
The draft survey displacement method step by step: draft means, both trim corrections, dock-water density and deductibles, with a worked example.
Η αναφορά δημοσιεύεται στα αγγλικά· η μετάφραση θα ακολουθήσει.
- Δημοσίευση
- Χρόνος ανάγνωσης
- 6 λεπτά
- Συντάκτης
- CARGOWARD® Technical Desk · Ναυτιλιακή Επιθεώρηση
- Γραμμή υπηρεσίας
- Ναυτιλιακή Επιθεώρηση →
CW-DWG-301 · Επιθεώρηση βυθισμάτων, πλώρηCW-RPT-09
A draft survey weighs a ship's cargo by weighing the ship. Read the drafts before loading and after, turn each set into a displacement with the vessel's hydrostatic tables, take away everything on board that is not cargo, and the difference between the two results is the cargo loaded or discharged. Done carefully, a draft survey (in British usage, a draught survey) is accurate to a few tenths of a per cent — and for bulk cargoes it is often the figure the bill of lading is based on.
How a draft survey works
A floating ship displaces its own weight in water. Its hydrostatic tables, drawn up by the shipyard, give that displacement for every draft, in sea water of 1.025 t/m³. Read the draft accurately, correct it for trim, hull deflection and the density of the water the ship floats in, and the tables give the ship's weight to within a few tonnes.
A survey is always a pair. The initial survey is made before loading (or before discharge), the final survey after. Between them, only the cargo — and anything pumped in or out, which is measured — has changed. Each survey ends in a net displacement: the ship's displacement less ballast, fuel, lubricating oil and fresh water. The difference between the two nets is the cargo.
The procedure is standardised; for coal cargoes the UNECE published a code of uniform standards and procedures that most surveyors follow for every bulk cargo.
Reading the six drafts
Drafts are read at the forward, midship and aft marks on both sides. Each pair is averaged, which removes the effect of list. Good readings are taken from a boat or the quay at water level, in calm water, at the mean of the wave's rise and fall; in a swell, surveyors read the highest and lowest points over several waves and take the mean.
The draft marks are not at the perpendiculars, the reference points of the hydrostatic tables, so each reading is first corrected to where the tables expect it:
Πού
- Mean drafts at the forward and aft marksm
- Apparent trim: aft mean less forward meanm
- Distance of the forward marks aft of the forward perpendicular, and of the aft marks forward of the aft perpendicularm
- Length between marks: LBP less both distancesm
The signs above hold for a ship trimmed by the stern with marks inside the perpendiculars, the usual case; the midship marks are corrected the same way when they are not at midships.
Mean of means and hog or sag
A loaded hull bends. When the midship draft is deeper than the average of the ends the ship is sagging; when it is shallower, hogging. The mean of means (the quarter mean) weights the midship draft to allow for that curve:
The two trim corrections
The tables give displacement for an even-keel ship. A trimmed ship pivots about its centre of flotation (LCF), which is rarely at midships, so the displacement read at the mean draft needs correcting:
Πού
- True trim, aft draft less forward draft at the perpendicularsm
- Distance of the LCF from midships; the first correction is positive when the LCF lies on the same side as the deeper endm
- Tonnes per centimetre immersion at the mean of meanst/cm
- Moment to change trim one centimetre at 0.5 m above and below the mean of meanst·m/cm
The first correction moves the displacement from midships to the LCF. The second, often called the Nemoto correction, allows for the LCF itself moving as the ship trims; it is always added, and it is small unless the trim is large — one more reason to survey with as little trim as the ship allows.
Dock water density
The tables assume sea water of 1.025 t/m³. In an estuary port the ship floats in lighter water and sits deeper for the same weight, so the displacement is corrected with the density measured alongside, with a hydrometer, at several depths:
Deductibles and the net displacement
From the displacement the surveyor subtracts every weight on board that is not cargo and can change between surveys: ballast water in each tank, fuel oil, diesel oil, lubricating oil and fresh water, each sounded and calculated with its own density. What remains is the net displacement: lightship, the ship's constant (stores, spares, sediment, everything unaccounted for) and the cargo.
A worked example: the final survey
A Supramax of 190 m between perpendiculars completes loading. Every step below is a formula; point at a cell to see it. The hydrostatic values are read from the vessel's tables at the mean of means, with the keel plate already allowed for:
| Item | Value | Unit |
|---|---|---|
| Forward draft, port | 12,18 | m |
| Forward draft, starboard | 12,22 | m |
| Midship draft, port | 12,31 | m |
| Midship draft, starboard | 12,35 | m |
| Aft draft, port | 12,46 | m |
| Aft draft, starboard | 12,5 | m |
| Forward mean | 12,2 | m |
| Midship mean | 12,33 | m |
| Aft mean | 12,48 | m |
| LBP | 190 | m |
| Forward marks aft of FP | 2,1 | m |
| Aft marks forward of AP | 4,8 | m |
| Length between marks | 183,1 | m |
| Apparent trim | 0,28 | m |
| Forward draft at FP | 12,197 | m |
| Aft draft at AP | 12,487 | m |
| True trim | 0,29 | m |
| Mean of means | 12,333 | m |
| Displacement at mean of means (SW) | 64.850 | t |
| TPC | 58,2 | t/cm |
| LCF from midships (− aft) | -3,1 | m |
| MTC at +0.5 m | 742 | t·m/cm |
| MTC at −0.5 m | 724,4 | t·m/cm |
| First trim correction | 27,54 | t |
| Second trim correction | 0,39 | t |
| Displacement corrected for trim | 64.877,93 | t |
| Dock water density | 1,0185 | t/m³ |
| Displacement in dock water | 64.466,51 | t |
| Ballast | 1.240,5 | t |
| Fresh water | 186 | t |
| Fuel oil | 1.512,3 | t |
| Diesel oil | 98,7 | t |
| Lubricating oil | 21,4 | t |
| Net displacement | 61.407,61 | t |
The true trim is 0.290 m by the stern and the mean of means 12.333 m. The midship draft is 12 mm shallower than the mean of the ends: the ship is hogging slightly. Because the LCF lies aft of midships and the ship is trimmed by the stern, the first trim correction is positive, 27.54 t; the second adds 0.39 t. Floating in water of 1.0185 t/m³, the ship displaces 64,466.51 t; less 3,058.9 t of deductibles, the net is 61,407.61 t.
From two surveys to the cargo
The initial survey, made the same way before loading, gave a net displacement of 11,931.62 t. The difference is the cargo:
| Item | Value | Unit |
|---|---|---|
| Net displacement, final survey | 61.407,61 | t |
| Net displacement, initial survey | 11.931,62 | t |
| Cargo loaded | 49.475,99 | t |
| Bill of lading figure | 49.520 | t |
| Difference | -44,01 | t |
| Difference in % of the B/L | -0,089 | % |
49,475.99 t by draft against 49,520 t on the bill of lading: 44 t, or 0.09 %, well inside the half per cent within which a draft survey and shore figures usually agree.
What limits the accuracy
The usual sources of error, and how surveyors contain them
Readings in a swell: take the mean of many readings, or read from the inboard side and check against a manometer. Dock water density: sample at several depths and along the ship's length; a 0.001 error in density moves a 60,000-tonne displacement by about 60 tonnes. Ballast soundings: sound every tank, including the ones declared empty, and allow for trim and list in the sounding tables. Large trim: the second trim correction is an approximation that loses accuracy as trim grows; survey with the ship as near even keel as possible. Hydrostatic tables: use the vessel's own approved tables, interpolated, never a sister ship's.
Questions about the draft survey
What is the ship's constant?
The weight on board that the survey cannot account for: stores, spares, sediment in tanks, paint, water in pipes. It is found from the initial survey as the net displacement less lightship, and it cancels out of the cargo figure.
Why is a draft survey sometimes different from the shore scale?
Both have tolerances: shore weighing for its scales and belts, the draft survey for readings, density and soundings. A difference within a few tenths of a per cent is normal; beyond that, both figures should be checked.
Can a draft survey be done at anchor?
Yes, if the water is calm enough to read the marks accurately. Swell, current and lack of a reliable density sample make anchorage surveys less precise than at a berth.
The draft survey calculator runs both surveys from your own readings and the vessel's hydrostatic rows, with every correction shown, and produces the survey report as a PDF. For cargo figures of record in Brazilian ports, the desk's marine survey surveyors attend initial and final surveys.
Πηγές
- Code of uniform standards and procedures for the performance of draught surveys of coal cargoesUnited Nations Economic Commission for Europe · 1992
- Draft surveyWikipedia↗
- The second trim correction in draught survey procedure: accuracy analysisTransNav, International Journal on Marine Navigation and Safety of Sea Transportation↗
- Draft surveyControl Union↗
Στην πράξη
Αναφορές με email
Κάθε νέα αναφορά, στα εισερχόμενά σας.
Μέθοδος, αριθμοί και τεκμήρια από το κέντρο: ένα email όταν δημοσιεύεται μια αναφορά, στη γλώσσα σας, και τίποτα άλλο.