Laytime and Demurrage Calculation: A Worked Example
A full laytime calculation from charter party terms and a statement of facts: time allowed, exceptions, when laytime expires and the demurrage due.
Denne rapporten er publisert på engelsk; en oversettelse kommer.
- Publisert
- Lesetid
- 6 min
- Forfatter
- CARGOWARD® Technical Desk · Chartering & Agency
- Tjenestelinje
- Skipsagentur →
CW-DWG-101 · Fartøy ved kaiCW-RPT-04
A laytime calculation turns two documents into one figure: the charter party says how much time the charterers have and what does not count, and the statement of facts says what actually happened in port. Put them side by side, line by line, and you know whether the ship earned demurrage or the charterers earned despatch. This note works through one complete laytime calculation for a grain loading in Paranaguá, with every formula shown.
The terms of the example
A Supramax loads soybeans at Paranaguá under a voyage charter party. The terms that matter for laytime:
| Term | Value |
|---|---|
| Cargo | 60,000 t soybeans |
| Loading rate | 10,000 t per weather working day of 24 consecutive hours |
| Sundays and holidays | Included (SHINC) |
| Notice time | 12 hours after a valid notice of readiness, unless sooner commenced |
| Shifting from anchorage to berth | Not to count |
| Breakdown of ship's gear | Not to count |
| Demurrage | USD 22,000 per day, pro rata |
| Despatch | Half demurrage, on laytime saved |
Laytime allowed
With a fixed rate, the laytime allowed is the cargo quantity divided by the daily rate:
Hvor
- Laytime allowedh
- Cargo quantity loaded (the bill of lading figure, unless the charter says otherwise)t
- Loading rate per weather working dayt/day
Because Sundays and holidays are included, every calendar day counts. Under SHEX terms, Sundays and holidays would be cut out of the count as well, which is where most laytime calculation disputes begin.
From the statement of facts to the time sheet
The notice of readiness was tendered at the anchorage at 08:00 on 3 August (the charter allows notice whether in berth or not). Laytime therefore starts at 20:00, after the 12-hour notice time. From there, the statement of facts is cut into periods, and each one is marked as counting or not:
| Period | From | To | Hours | Counts | Laytime used (h) | Cumulative |
|---|---|---|---|---|---|---|
| Notice time after NOR | 03 Aug 08:00 | 03 Aug 20:00 | 12,0 | 0 | 0,0 | 0d 00h 00m |
| At anchorage, waiting for berth | 03 Aug 20:00 | 04 Aug 06:00 | 10,0 | 1 | 10,0 | 0d 10h 00m |
| Shifting anchorage to berth | 04 Aug 06:00 | 04 Aug 09:00 | 3,0 | 0 | 0,0 | 0d 10h 00m |
| At berth, loading | 04 Aug 09:00 | 05 Aug 14:00 | 29,0 | 1 | 29,0 | 1d 15h 00m |
| Rain, hatches closed | 05 Aug 14:00 | 05 Aug 19:30 | 5,5 | 0 | 0,0 | 1d 15h 00m |
| Loading | 05 Aug 19:30 | 06 Aug 11:00 | 15,5 | 1 | 15,5 | 2d 06h 30m |
| Ship’s crane breakdown | 06 Aug 11:00 | 06 Aug 14:00 | 3,0 | 0 | 0,0 | 2d 06h 30m |
| Loading | 06 Aug 14:00 | 07 Aug 02:00 | 12,0 | 1 | 12,0 | 2d 18h 30m |
| Rain, hatches closed | 07 Aug 02:00 | 07 Aug 06:00 | 4,0 | 0 | 0,0 | 2d 18h 30m |
| Loading to completion | 07 Aug 06:00 | 10 Aug 16:00 | 82,0 | 1 | 82,0 | 6d 04h 30m |
| Total | 176,0 | 148,5 | 6d 04h 30m |
The ship spent 176 hours in port from notice to completion; 148.5 of them count as laytime. Notice time, the shift to the berth, the rain and the crane breakdown are taken out under the charter's terms.
How each line is decided
Waiting at anchorage counts: the charter allows notice whether in berth or not, so waiting for the berth is the charterers' time. Shifting does not count, because the charter says so; without that clause, shifting time would usually count. Rain stops the count because laytime is in weather working days: a period when the weather prevents loading is not a working period. The ship's crane stopped work through the ship's fault, and the charter excludes breakdowns of ship's gear. Each of these decisions depends on wording: change a clause and the line changes.
When laytime expires
Laytime runs out when the cumulative count reaches the 144 hours allowed. By 06:00 on 7 August, 66.5 hours have been used; the remaining 77.5 hours run out during the final loading period, at 11:30 on 10 August. From that moment the ship is on demurrage until loading is completed at 16:00.
The maxim "once on demurrage, always on demurrage" matters here: after laytime has expired, the exceptions that stopped the clock no longer do, unless the charter party expressly says they apply during demurrage too. Had it rained on the afternoon of 10 August, the ship would still have earned demurrage for those hours.
The same search, written as code — useful when a time sheet has dozens of periods:
from datetime import datetime, timedelta
def expiry(periods, allowed_h):
"""periods: (start, end, counts) in order; returns when laytime runs out."""
used = 0.0
for start, end, counts in periods:
hours = (end - start).total_seconds() / 3600
if counts and used + hours >= allowed_h:
return start + timedelta(hours=allowed_h - used)
if counts:
used += hours
return None # laytime not used up: despatch may be due
t = lambda s: datetime.strptime(s, "%d %b %Y %H:%M")
periods = [
(t("03 Aug 2026 20:00"), t("04 Aug 2026 06:00"), True),
(t("04 Aug 2026 06:00"), t("04 Aug 2026 09:00"), False), # shifting
(t("04 Aug 2026 09:00"), t("05 Aug 2026 14:00"), True),
(t("05 Aug 2026 14:00"), t("05 Aug 2026 19:30"), False), # rain
(t("05 Aug 2026 19:30"), t("06 Aug 2026 11:00"), True),
(t("06 Aug 2026 11:00"), t("06 Aug 2026 14:00"), False), # ship's crane
(t("06 Aug 2026 14:00"), t("07 Aug 2026 02:00"), True),
(t("07 Aug 2026 02:00"), t("07 Aug 2026 06:00"), False), # rain
(t("07 Aug 2026 06:00"), t("10 Aug 2026 16:00"), True),
]
print(expiry(periods, 144)) # 2026-08-10 11:30:00
Demurrage due
Demurrage is the time on demurrage, in days, multiplied by the daily rate:
| Item | Value | Unit |
|---|---|---|
| Cargo | 60 000 | t |
| Loading rate | 10 000 | t per WWD |
| Laytime allowed | 144 | h |
| Laytime used (time sheet) | 148,5 | h |
| Time on demurrage | 4,5 | h |
| Demurrage rate | 22 000 | USD per day |
| Demurrage due | 4 125 | USD |
Four and a half hours on demurrage at 22 000 USD/day come to 4 125,00 USD. Small, but typical: most laytime claims are decided by a handful of hours, which is why every line of the statement of facts deserves attention.
And if loading had finished early: despatch
Suppose loading had been completed at 22:00 on 9 August. From the start of laytime that is 146 hours, less the same 15.5 hours of exceptions: 130.5 hours used, and 13.5 hours of laytime saved. At half the demurrage rate (USD 11,000 per day) the charterers would earn 6 187,50 USD in despatch. Whether despatch is paid on all time saved or only on working time saved depends, again, on the charter's wording.
Reversible and averaged laytime
The example covers a single loading port. Many charters cover loading and discharging together, and two common arrangements change the arithmetic.
With reversible laytime, the time allowed for loading and discharging is one pool: the hours saved at the loading port can be used at the discharge port, and demurrage is calculated only once, on the total. The time sheets of both ports are added before laytime expiry is worked out.
With averaged laytime, the two ports are calculated separately, and the time saved at one is set off against the demurrage incurred at the other. The result is often close to reversible laytime but not identical, because despatch and demurrage rates differ and because "once on demurrage" applies port by port.
Neither arrangement applies unless the charter party says so. Where it does, run the laytime calculation for each port first, and combine the results exactly as the clause describes.
Checks before you sign a laytime calculation
- The notice of readiness was valid when tendered, and the notice time was applied as the charter says
- Every exception taken out of the count is written in the charter party, not only customary
- Weather stoppages are supported by the statement of facts and, ideally, the deck log
- Time zones and daylight saving are consistent across all documents
- Nothing was deducted after laytime expired unless the charter keeps the exception during demurrage
- The cargo figure used for laytime allowed matches the bill of lading or the charter's basis
- SHINC
- Sundays and holidays included: they count as laytime.
- SHEX
- Sundays and holidays excepted: they do not count, unless used, if the charter says so.
- WWD
- Weather working day: a working day on which the weather allows the cargo work to proceed.
- Reversible laytime
- Loading and discharging time added together, so time saved at one port can be used at the other.
- Despatch
- Money paid by the owners for laytime saved, usually half the demurrage rate.
- Pro rata
- In proportion: part of a day is paid as the same part of the daily rate.
Every figure above can be reproduced with your own charter party and statement of facts in the laytime calculator, which also reads an agent's SOF pasted as text. For calls in Brazilian ports, the desk's shipping agency keeps the statement of facts that the calculation depends on. The calculation starts with the notice, so it is worth reading when a notice of readiness is valid.