Santos --:--:-- BRT
Contact
Hold cleaning plannerCW-TOOL-01

Will the holds be ready inside the time in port?

Set the vessel, the holds, the cargo change, the port and the days in port. The planner returns the cleaning standard, the laytime against your stay, the inspection risk and the method: a technical plan to share, download or send to the desk for an official quotation.

Output
Plan · PDF · QR code
Shift
07:00–18:00
Equipment
5 × 500 bar · fresh water
Response
< 15 min to a coordinator

Plan a cargo hold cleaning: the cleaning standard, the laytime against the time in port, the inspection risk and the method, with a PDF and a link to send the desk.

01

Vessel & operation

01Vessel

Name, IMO and flag are optional; the size draws the plan view

Seven digits

02Holds & cargo

The next cargo sets the cleaning standard

03Operation

Where, for how long, with how many crews: the laytime is read against the stay

Location
Time at anchorage
4days
Calendar days · one 07:00–18:00 shift a day
Cleaning crews
12–14 pax per crew

04Add-ons

Extra work the desk adds to the scope

02

Plan view

CW-PLN-001
No.55No.44No.33No.22No.11

CW-PLN-001SupramaxLOA 190 mB 32.26 m5 holds50–60k DWTScale NTS

03

Laytime estimation

AGW/WP

2–3days

22–33 h of shift work · 07:00–18:00 (11 h)

Fits the stay1 d to spare

Standard
2–3 d
Holds
× 1.00
Crews
× 1.00
Previous cargo
× 1.00
Add-ons
+ 0 d

5 fresh-water hydro-jet units · 500 bar

An estimate: the condition of the holds can make the cleaning shorter or longer.

04

Inspection risk

Low

  • Grain clean needs dry, odour-free holds
  • Fresh-water jets at 500 bar and a white-rag test before the survey
05

Cleaning standard

GRAIN

Grain clean

Clean, dry, odour-free; no loose rust or residue

CoalCorn

06

Policy

NO CURE, NO PAY

Subject to reasonable cleaning timeframe

07

Method

07
  1. 01Sweep & muck-out
  2. 02Sea-water pre-wash · fire hoses
  3. 03Chemical treatment
  4. 04Sea-water wash
  5. 05Fresh-water hydro-jetting · 500 bar
  6. 06Controlled drying & ventilation
  7. 07Inspection · white-rag test

Chemical: Coal-dust degreaser

Submit scope for official quotation

Estimated time is AGW/WP (All Going Well / Weather Permitting) and subject to vessel availability.

This is a Technical Scope & Laytime Estimation, subject to official quotation.

02How to useCW-SH-02 · Rev C

Four steps, one plan you can send.

Everything updates as you go: nothing is sent until you choose to send the scope.

  1. 01

    Describe the vessel

    Name, IMO and flag are optional; the size class draws the plan view to its real length and beam.

    Go to the vessel
  2. 02

    Set the holds and the cargo change

    The holds re-divide the cargo length; the next cargo sets the cleaning standard: grain, hospital or normal.

    Go to the cargo
  3. 03

    Say where, and for how long

    Port, anchorage or berth, the days in port, the crews and any add-ons: the laytime is read against that stay.

    Go to the operation
  4. 04

    Read it, share it, send it

    Standard, laytime, inspection risk and method update live. Copy the link, scan the QR code, download the PDF — or send the scope to the desk.

    Go to the plan
03MethodCW-SH-03 · Rev C

How the estimate is worked out.

The desk’s own figures, written into the planner: it works out time, standard and risk, never a price.

Reference: five holds, two crews and the 5 fresh-water hydro-jet units at 500 bar, after an easy cargo.
StandardNext cargoReference daysCeiling
Hospital cleanWoodpulp, Alumina3–4 days5 days
Grain cleanCorn, Soybeans, Sugar2–3 days4 days
Normal cleanFertiliser, Iron ore, Coal, Steel products2–2.5 days4 days
Holds
Seven holds add half a day to the top of the range; fewer holds take less, on a curve.
Previous cargo
Coal, iron ore and grain are the reference; fertiliser, metcoke, petcoke and clinker add a little.
Crews & add-ons
More crews shorten the job with diminishing returns; scraping and anti-rust add a quarter day each.
Time in port
Fits when the stay covers the top of the estimate, tight when only the bottom, exceeds otherwise.
Inspection risk
Starts low with the method; rises for a hospital clean, a filming or salty residue and too little time in port.
Washing order
Sea-water pre-wash with fire hoses, chemical, sea-water wash, then fresh-water hydro-jets at 500 bar.
04FAQCW-SH-04 · Rev C

Questions the desk is asked most.

01Is the plan a quotation?

No. It is a technical scope and laytime estimation: the cleaning standard, the time, the inspection risk and the method. The official quotation comes from the desk once you send the scope; the planner never shows a price.

02How exact is the laytime?

It is an estimate, AGW/WP, built on the desk’s own figures: five fresh-water hydro-jet units at 500 bar on board, 2–3 days for five holds of grain clean and up to 5 days for a hospital clean. The condition of the holds can make it shorter or longer.

03What sets the cleaning standard?

The next cargo. Woodpulp and alumina call for hospital clean; corn, soybeans and sugar for grain clean; any other cargo for normal clean.

04Why does it ask for the time in port?

To read the cleaning against the days the vessel stays at anchorage or at berth: it fits, it is tight, or it runs past the stay — and the planner suggests a crew more or a longer stay.

05Can the holds be cleaned at berth?

Yes, subject to Port Authority approval. Anchorage is the default; choose the location and the days there in the operation step.

06How do I share or keep the plan?

Every input lives in the page address: copy the link, scan the QR code or download the PDF, and the same plan opens again, exactly as you left it.

07Does the planner store my data?

No. Nothing leaves your browser until you send the scope from the contact page, where you add your name, company and contact details.

08What happens after I send the scope?

A coordinator at the operations desk replies within 15 minutes, confirms feasibility for the port and the dates, and sends the official quotation.