Cargo Hold Cleaning: Procedure for Bulk Carriers

The cargo hold cleaning procedure for bulk carriers, step by step: residues out dry, washing order by structure, chemicals, rinse, drying, inspection.

Published
Reading time
13 min
Author
CARGOWARD® Technical Desk · Hold Cleaning
Share

CW-DWG-205 · Hold structure & cleaning traps

A cargo hold cleaning procedure is the order of work that takes a bulk carrier's hold from the residues of the last cargo to the standard the next one needs: residues out dry, washing from the top down, a chemical where the residue calls for one, a fresh-water finish, drying, and an inspection the hold passes the first time. The order matters as much as the water. A crew that washes the tank top before the frames above it washes it twice, and a hold that is still wet when the surveyor climbs down fails however clean the steel is.

This note sets out the procedure the way it is worked in practice — on the structure itself. The drawing below is a Kamsarmax hold in section, with every member a cleaning crew has to reach numbered in the order it is washed.

The hold, member by member

Hold cleaning is structural work. Residue does not stay long on open plating; it lodges where plates meet and stiffeners end — the toes of the frame brackets, the tops of flanges, the ledge in front of a corrugated bulkhead, the corner of the hopper. Knowing the members by name is how a cleaning plan, a crew and a surveyor talk about the same place.

CW-DWG-205 · Hold structure & cleaning trapsRev C
CW Kamsarmax, No.4 hold, looking forward to the bulkhead at FR 158: cut at FR 146, stepped back to FR 151 on the starboard side to open the double bottom, the hopper and the topside tank. Marks 01 to 11 follow the washing order.

The drawing is a single-skin bulk carrier hold, the arrangement of most Handysize to Kamsarmax ships, at its real dimensions: 32.26 m beam, 20.05 m depth, frames 850 mm apart, a hatch 15 m wide. The numbers in brackets are the marks on it.

Double bottom (14)
The ballast tank under the hold, from the bottom shell to the inner bottom: 1 950 mm deep here.
Solid floor
A transverse plate across the double bottom, here every third frame, with slots for the longitudinals and holes to lighten it and let the tank be entered.
Centre girder and side girders
Longitudinal plates through the double bottom: one on the centreline, three a side, the outermost under the hopper knuckle.
Bottom and inner-bottom longitudinals
Stiffeners running fore and aft on the bottom shell and under the tank top, 850 mm apart.
Inner bottom, or tank top (10)
The top of the double bottom and the floor of the hold. It takes the blows of grabs and bulldozers, and every residue washed down from above.
Bilge hopper (09)
The sloping tank between the tank top and the side shell, at 45°. Inside, a transverse ring every third frame and longitudinals on the plating; outside, the slope where residue settles.
Hold frames (06)
The side shell's stiffeners in the hold, one in every frame space, each with a bracket at the hopper and another at the topside tank.
Topside tank (05, 15)
The tank under the deck at each side. Its sloping plate, the topside tank bottom, is the highest steel in the hold; inside, deck, side and bottom transverses form a ring that carries the deck and side longitudinals.
Corrugated transverse bulkhead (07)
The wall between two holds, folded into vertical corrugations — here 850 mm deep at a 2 520 mm pitch — so that it needs no stiffeners.
Lower stool (08)
The box the bulkhead stands on, 3 300 mm high here, with a narrow ledge in front of the corrugations and shedder plates sloped into each trough to keep cargo off it.
Upper stool (04)
The box that joins the top of the bulkhead to the cross deck.
Hatch end beam (02)
The deep transverse girder under the hatch end coaming, carrying the coaming and the end of the cross deck.
Cross deck beams (03)
Transverse beams under the cross deck, the strip of deck between two hatches.
Hatch coamings (01)
The plating round the hatch opening, 1 950 mm high here — hatch side coamings along it, hatch end coamings across it — topped by the bars the hatch cover seals bear on.
Bilge well (11)
The sump at a corner of the tank top that the hold drains to, under a perforated cover, with a bilge suction and a sounding pipe.
No.MemberWhere residue hidesWhat the cleaning needs
01Hatch coamings and coversTop bars, compression bars, drain channels, cover undersidesCleaned first: anything left there falls into a clean hold
02–04Hatch end beam, cross deck beams, upper stoolTops of the lower flanges, ledges under the cross deckJets aimed upward from a lift or the tank top
05Topside tank sloping plateA dust film on the underside, the highest steel in the holdMonitor jets or a lift: 11.8 m above the tank top at the side
06Hold frames and bracketsBracket toes, flange tops, the back of every webBoth faces of each web; toes scraped by hand where needed
07–08Corrugated bulkhead, lower stoolTrough corners, the stool ledge in front of the corrugationsTrough by trough; the ledge swept before it is washed
09Bilge hopperA band of residue along the slope, the knuckle at the tank topWashed after the frames above it
10–11Tank top, bilge wellsEverything washed down from aboveLast of all; well covers off, strainers cleaned

Before the first jet: planning the job

Most failed cleanings are lost in the planning. Five questions settle the plan:

  1. Which standard? The next cargo and the charter party decide: grain clean for most grains, fertilisers and cement, hospital clean for kaolin, rice and some food cargoes. The note on hold cleaning standards compares them.
  2. What was the last cargo? Coal and petroleum coke leave an oily film that needs a chemical; cement and clinker set hard and need scraping; fertilisers leave salt that only fresh water removes.
  3. How much time? Count the hours on the ballast passage and in port against the weather. Washing with the hatches open needs dry weather, and drying needs more of it.
  4. How much water and chemical? Fresh water for the final pass is often the limit on board. Chemicals must be approved for the purpose, compatible with the hold coating, and not harmful to the marine environment if the washing water is to go overboard.
  5. Where will the washing water go? That depends on how the residue is classified under MARPOL Annex V and on where the ship will be. Plan the washing for waters where discharge is allowed, or plan to keep the water on board.

The hold cleaning planner works these through for a given ship, cargo change and port stay: the standard, the method steps and the time the holds take.

Safety in the hold

A hold under cleaning is a work site with four standing hazards, and the procedure starts with them:

  • Atmosphere. After some cargoes a hold is an enclosed space. Coal, wood products and some metals consume oxygen or give off gases, and fumigated grain leaves phosphine. Ventilate, test the atmosphere at several heights, and enter under the ship's enclosed-space procedure.
  • Height. Topside slopes and frames are worked from lifts, cherry pickers or staging: harnesses clipped on, platforms checked, a permit to work issued for every job aloft.
  • High-pressure water. A 500-bar jet cuts skin and drives water under it. Trained operators only, dead-man triggers on every gun, never a jet toward a person; hoses and couplings checked before each shift.
  • Chemicals. Read the safety data sheet before the drum is opened; goggles, gloves and chemical suits; never mix products.

Hatch covers are opened at sea only in weather the master accepts, and secured open.

The cargo hold cleaning procedure, step by step

The sequence below is the one the desk's teams work, from the last grab of discharge to the surveyor's signature. Inside every step the washing order is the same: from the top of the hold down.

  1. Sweep and muck out

    Shovels and brooms first, from the top down: coaming tops, the brackets and flanges that can be reached, hopper slopes, stool ledges, the tank top. Bag the residue and lift it out of the hold. Residue removed dry now is residue the water never has to carry.

  2. Scrape and chip set residue

    Cement, clinker and some fertilisers set hard wherever water collected. Scrape them off the bracket toes, the hopper corners and the stool tops before any washing: a jet only polishes a set residue.

  3. Pre-wash with sea water

    Fire hoses or a monitor gun take off the bulk of what is left, top-down: hatch cover undersides, coamings, the cross deck, topside slopes, frames, bulkheads, stools, hoppers, tank top.

  4. Apply the chemical

    Where the last cargo leaves a film — coal, petcoke, oily or sticky residues — spray the approved cleaning chemical evenly at low pressure, keep to its dwell time, and never let it dry on the steel.

  5. Wash the chemical off

    A sea-water wash takes off the chemical and the residue it loosened, again from the top down, while the surface is still wet.

  6. Hydro-jet with fresh water

    High-pressure fresh water — 500 bar on the desk's units — over every surface, top-down, trough by trough and web by web. Fresh water takes off the salt the sea-water passes left behind; after a fertiliser cargo the whole hold is washed with fresh water only.

  7. Test for chlorides where the cargo asks for it

    For cargoes sensitive to salt, a silver nitrate test on bulkheads and frames shows whether chlorides remain. If they do, the fresh-water pass is repeated where the test failed.

  8. Pump out, dry and ventilate

    Pump the bilge wells dry and clean their strainers, squeegee standing water into the wells, and ventilate until the steel is dry to the touch. A wet hold fails grain clean however clean it is.

  9. Make the bilge wells and hatch covers ready

    Test the bilge suctions and their non-return valves, refit the well covers — wrapped in burlap before a grain cargo — clean the hatch cover drain channels and compression bars, check the rubber seals and test the covers for tightness.

  10. Inspect before the surveyor

    Walk every hold with a torch and a white rag: no residue, no loose scale or paint flakes, no odour, no insects, dry. Photograph each hold and log the times, then call the surveyor.

Lime wash and barrier coatings

Before a sulphur cargo, holds are often lime-washed: the alkaline coat protects the steel from the acid that wet sulphur forms. Before petroleum coke, some owners apply a barrier coating that lets the coke wash off more easily. Both come off with the residue at the next cleaning, and both must be gone before a grain or food cargo — a step that belongs in the plan from the start.

How much steel one hold has to wash

The tank top is the surface everyone looks at, and the smallest part of the job. The areas below are taken from the dimensions of the hold in the drawing; corrugated faces are counted at 1.4 times their flat area, and every hold frame at 8 m² of web, flange and bracket.

—Point at a cell to see its formula
CW Kamsarmax No.4 hold
Surface · drawing no.Area (m²)Share
Hatch coamings, inside faces · 011213%
Hatch end beams and cross deck undersides, both ends · 02–032095%
Upper stools, both ends · 041003%
Topside tank sloping plates · 0547012%
Side shell between hopper and topside tank · 063058%
Hold frames and brackets, 28 a side · 0644812%
Corrugated bulkheads, two faces · 071,00726%
Lower stools and ledges, both ends · 081885%
Bilge hoppers · 093439%
Tank top between the stools · 1045912%
Hatch cover undersides2426%
Steel to wash in one hold3,891100%
CW Kamsarmax No.4 hold
Illustrative areas from the drawing: hold 24.65 m long (FR 129–158), hatch 16.15 × 15.0 m, hopper slope 7.58 m, topside slope 9.88 m.

Two things follow. The tank top is barely an eighth of the work. And almost three quarters of the steel stands upright or hangs overhead — frames, bulkheads, stools, the cross deck and the topside slopes — which is why reach decides the pace more than the number of hands: lifts and monitors to get the jet there, and enough pressure to do the work 12 metres up. Cleaning time grows with this surface, not with the tonnage of the last cargo.

Washing water and residues under MARPOL Annex V

Swept residue and hold washing water are both garbage under MARPOL Annex V. If the shipper declares the cargo harmful to the marine environment (HME), its residues go ashore to a reception facility. If not, the residues and the washing water may be discharged en route, outside special areas, as far as practicable from land and not less than 12 nautical miles from it — and any cleaning agent in the water must not be harmful either. Every discharge and every delivery ashore goes into Part II of the Garbage Record Book.

The note on MARPOL Annex V and hold washing water covers the special areas, the HME criteria and the records in detail.

Inspection and records

A surveyor appointed by the charterers or the shippers walks every hold and passes or fails it, and in some grain trades a government inspector does the same. What they look for is the standard named in the charter; what decides the argument afterwards is the ship's own record:

  • The cleaning start and finish of every hold, logged as they happen
  • Photographs of each hold after drying: tank top, hoppers, frames, bulkheads, the cover undersides
  • The chloride test results, where the cargo required one
  • The chemical used, with its data sheet and its statement that it is not harmful to the marine environment
  • Discharges of residues and washing water, or the receipt from the reception facility, in the Garbage Record Book
  • The inspection time, the result and the surveyor's name — and, after a failure, the re-cleaning and the re-inspection

Questions about the cargo hold cleaning procedure

How long does it take to clean a cargo hold?

For a Supramax-size hold going from coal to grain clean, the washing typically takes 8 to 12 hours with a shore team's high-pressure units, followed by drying. Petcoke, clinker and hospital clean take longer. The hold cleaning planner works the whole ship against the time in port.

In what order is a cargo hold washed?

From the top down: hatch covers and coamings, the underside of the cross deck, the topside tank slopes, the frames and side shell, the bulkheads and stools, the hoppers, then the tank top and the bilge wells. Washing upward puts residue back on steel that was already clean.

Can a cargo hold be washed with sea water only?

The washing can be, but the last pass should be fresh water: salt left on the steel corrodes it and contaminates sensitive cargoes, and charterers may test for chlorides. After a fertiliser cargo the whole hold is washed with fresh water.

Who cleans the holds, the crew or a shore team?

Both are common. Crews clean on the ballast passage when time, water and weather allow; shore teams with high-pressure units take over when the port stay is short, the residue is heavy or the standard is hospital clean.

What is the white rag test?

A clean white cloth wiped along frames, bulkheads and the tank top. If it comes away marked by the last cargo, the hold is not clean. Surveyors use it as the deciding test, so the ship should use it first.

For a cargo change in a Brazilian port, the desk's cargo hold cleaning teams work this procedure with fresh-water jets at 500 bar on a no cure, no pay basis, and stay with the holds until the surveyor accepts them.

Sources

  1. Bulk Carriers: Guidelines for Surveys, Assessment and Repair of Hull Structures (Rec. 76)IACS · 2017
  2. Cargo Hold Cleaning Standards GuidanceBritannia P&I Club · 2024
  3. Carefully to Carry: hold cleaningUK P&I Club · 2023
  4. Hold cleaning of bulk vesselsThe Swedish Club
  5. Hold cleanlinessThe Shipowners' Club
  6. Simplified overview of the discharge provisions of the revised MARPOL Annex VInternational Maritime Organization

Put it to work

T-01Hold cleaning plannerStandard, laytime against the time in port, inspection risk and method for a cargo changeOpen the tool

SVC-01 · the service

Cargo Hold Cleaning

Hold and fuel-tank cleaning planned hold by hold against the berth window, worked by crews who know what each residue needs, and closed with photos and waste records the surveyor and the charterer can check.

Reports by e-mail

Every new report, in your inbox.

Method, figures and evidence from the desk: one e-mail when a report is published, in your language, and nothing else.

One e-mail when a report is published, after you confirm the link we send. Unsubscribe at any time. Privacy Policy

Operations desk · 24/7

Request operational support. The desk answers 24/7.

Share vessel, port and ETA. A coordinator — not a call centre — replies within 15 minutes, day or night.

Request a plan